No. |
Projects |
1 | Industrial Water Pipes – SIDCCO |
2 | Piping for Fire Fighting System – SIDCCO |
3 | Construction of 6 Storage Tanks – SIDCCO |
4 | 30 km GAS Pipeline, size 16″ – Ahdeb Oil Field |
5 | 30 km Crude Oil Pipeline, size 10″ – Ahdeb Oil Field |
6 | Construction of a total of 53 km Production Flow Lines, size 6″ – Ahdeb Oil Field |
7 | GAS Pipeline Size 16″ & Crude Oil Pipeline Size 10″, 30 km each – Ahdeb Oil Field |
8 | 27 Crude Oil Production Flow Lines, Total 118 km – Rumaila Operating Organization / BP Iraq |
9 | Dressing Production Manifold – 15 Slots at DSO9 – Rumaila Operating Organization / BP Iraq |
10 | Water Intake Pipeline, size 24″ at K44, Total 11 km – Rumaila Operating Organization / BP Iraq |
11 | Erection of 200 NOS of Crude Oil WH Control Skids – Rumaila Operating Organization / BP Iraq |
12 | 43 Crude Oil Production Flow Lines – Total 215 km – Rumaila Operating Organization / BP Iraq |
13 | CPS6 Temporary Pumping Project – Weatherford / Rumaila Operating Organization / BP Iraq |
14 | Crude Oil Trunk Line 18″ to PM-400 & PM-300 at DSO2 – Rumaila Operating Organization / BP Iraq |